Construction of the new cargo handling apron at Riga Airport
08.03.2021Commisioned by SJSC Riga International Airport
Construction: 2019 – 2020
Three large fuselage aircraft stands, two service roads and a taxiway have been built. Apron concrete cover – 42 cm. Total concreting volume – more than 3 ha.
Construction of service roads. Two and three – layer asphalt concrete pavement. Total surface area – 14 970 m2.
Rainwater drainage, electricity supply, lighting control system. The apron has been equipped with an underground refuelling hydrant system.