05.11.2019

Customer: Valka Municipality.
Period of construction: autumn 2010 - November 2011.

Total length of Valka transit route is 4.749 km. 500 m of beltway were constructed anew, the other volume is reconstruction. The bridge over the Pedele en route of the transit road has been reconstructed completely.

Throughout the length of Valka transit route the pedestrian sidewalks, cycling routes, bus stops and engineering communications were built.

Modern engineering and technical solutions were used in the object. Special economical Philips LED lights were installed for the first time in the Baltics. A total of 208 such lighting units were installed in the object.