The tram line was reconstructed and upgraded to accommodate low-floor trams along a section of more than 7 km, extending from the Spīķeri Quarter on Latgales Street to the terminal in Ķengarags.

Tram Track Works

  • New tram tracks – 5.3 km
  • Granite cobblestone paving – 10,615 m²
  • Decorative paving within the tram track zone – 2,480 m²

Associated Infrastructure

  • New tram stops – 30
  • Platform kerbs – 2.4 km
  • Reconstructed water supply network – 950 m
  • Reconstructed and renewed sanitary sewer network – 1.1 km
  • New overhead contact line system – 10 km
  • New or renewed overhead line poles – 276
  • DC power cables – 50.5 km
  • Street lighting power cables – 6 km
  • Asphalt pavement – 15,630 m²
  • Road and sidewalk kerbs – 4.2 km
  • Granite cobblestone paving on roads and sidewalks – 15,015 m²
  • Road signs installed – 352
  • Landscaping and topsoil works – 8,450 m²