Construction of additional infrastructure on Krievu Island
07.11.2019Commisioned by Freeport of Riga Authority.
General contractor: AS "A.C.B."
Duration: 14 months (October, 2017 - December, 2018).
Multifunctional bulk cargo terminal. Construction of engineering communication. Cargo area and railway construction.
Windbreak fence construction – 23 metres high and over 2 km long. Technology in Latvia for the first time. The most important function of the windbreak fence – preventing coal dust from blowing into the air and ending up in the environment.