Logo hamburger
About companyarrow
Spheres of businessarrow
Projects
Contacts
icon
Lv En
img

Construction of infrastructure in Lucavsala

30.01.2025

Project commissioning party: Riga City Council.
Construction: Road construction firm Binders Ltd.
Construction period: 2024

Construction of a continuation of Laivu Street and a new street. The total length of built streets in Lucavsala  1.3 km.

According to the project, a continuation of Laivu Street has been built about 600 m in length with a vehicle turnaround area.

In turn, the new infrastructure built connects Lucavsalas Street to Laivu  Street. It also has a length of just over 600 m.

Along one carriageway of Laivu Street a separate pedestrian and bicycle road has been constructed in the direction of the Island Bridge to the South Bridge, while on the other side of the carriageway a pedestrian pavement has been built. Between the carriageway and pavements is a dividing lane with a green area where street lighting is located.

Construction activities also included the construction of a rainwater sewerage and street lighting system, as well as the reconstruction of the power line section.