More than half of the section to reconstruct was renewed applying the recycling method.
The remaining section underwent a full reconstruction with the restoration of the road subsoil.
The project also provided for the reconstruction of the existing in the section bridge over the Svetupe River, the repair of the engineering lines of the road and public transport stops.